Welcome to Cannie Energy Park
The Project
RES is proposing to develop Cannie Energy Park which is a new renewable energy project within the broader area previously associated with Cannie Wind Farm. While located within a similar area to the Cannie Wind Farm, which was referred under the Environment Effects Act in 2024, the project differs materially in its design, scale and transmission connection approach. As a result, Cannie Energy Park is being progressed through a separate planning pathway and will be subject to its own environmental and planning assessment process. The former Cannie Wind Farm Environmental Effects Statements (EES) process is currently on hold.
Although the same company is developing Cannie Energy Park, it is a separate proposal and draws on RES’s knowledge of the site and surrounding community. RES intends to construct only one of the projects.
Cannie Energy Park consists of:
o up to 54 wind turbines;
o a BESS of up to 200MW / 800MWh;
o no proposed solar; and
o a 3.5km transmission line in council road corridor, to connect into the existing 220kv transmission line to the northeast of the project.
Location Plan
Click to enlarge and download
Latest concept infrastructure layout
Click to enlarge and download
Acknowledgement of Country
About RES
Click here to view the RES Group website.